County Road B Reconstruction (2024)

Overview 


The City of Roseville Capital Improvement Plan has identified County Road B, between Eustis Street and Cleveland Avenue for a reconstruction project in 2024. The current scope of the project includes reconstructing the pavement surface, improving drainage, separating the pathway, and upgrading some spot utilities. The City will engage area residents and the public beginning in the summer of 2021 and over the next two years to determine the final project layout and details.


Public Engagement


Additional public engagement for the project will be held throughout 2021 and 2022 to develop the final scope of the project.  Residents will be notified prior to meetings when dates are picked.

Past Engagement


The first public engagement meeting was held on June 17, 2021.  This meeting was held virtually.  Staff introduced the project and began to get feedback on issues to start to develop the final project details. 

A second neighborhood meeting was held on Thursday, September 16, 2021, at Lexington Park.  Information presented at the meeting is included below:

Four design options were shown:

Parking Survey


A survey was sent to residents in the neighborhood about parking needs along County Road B.  Results of the survey are included below.

Funding


The cost of this project will be funded with City street funds, municipal State Aid funds (gas tax), utility funds, and assessments. Details of the assessment cost will be determined in a feasibility report which will be finalized in the fall of 2022. Assessments will likely follow the City’s assessment policy

Schedule


Project Development 2021-2022
Approve Final Layout Fall 2022
Preliminary Assessment Hearing Winter 2022
Approve Final Plans – Fall 2023
Award Bids – February 2024
Construction – Spring -  Fall 2024