Long Lake Lift Station Project

Overview 

The City of Roseville will be rehabilitating the sanitary sewer pumping (lift) station and replacing the forcemain located under Long Lake Road, north of County Road C2.  The forcemain replacement will use a method called directional drilling, which allows the pipe to be installed using small excavation areas rather than digging up the whole length of the roadway.  Construction is anticipated in 2023.  Funding for the project is provided by the sanitary sewer utility fund.  

There will be no assessments to adjacent property owners. 

Schedule

More schedule information will be posted once a contractor has been selected for this project.

May 8, 2023 – City Council Awards Contract
Summer/Fall 2023 – Construction